Running an industrial plant on outdated or patched-together control systems is risky.

Unplanned downtime, undocumented PLC changes, and aging SCADA systems turn daily operation into guesswork.

We upgrade and integrate industrial automation systems without unnecessary disruption to production.

PLC SCADA / HMI System Upgrades Industrial IoT

What We Do

We design, upgrade, and integrate industrial automation systems for operational environments that cannot afford mistakes.

🔄

Industrial Automation Upgrade

Modernize your existing control systems without unnecessary downtime. We upgrade legacy PLC and SCADA systems to current platforms, ensuring minimal production interruption and complete documentation.

  • PLC system migration (S7-300 to S7-1500, etc.)
  • SCADA and HMI modernization
  • Control panel upgrades
  • System documentation and optimization
⚙️

Industrial Automation Development

Complete automation solutions from concept to commissioning. We design and implement control systems for new installations or process expansions that are built for long-term operation.

  • PLC programming and system design
  • SCADA / HMI development
  • System integration and commissioning
  • Process automation solutions
📡

IoT Solutions Development

Connect your industrial processes to gain visibility and control. We develop Industrial IoT systems that bridge operational technology with data analytics for smarter decision-making.

  • Industrial IoT architecture and implementation
  • Data collection and monitoring systems
  • Custom automation software
  • Integration with existing plant systems

From single machines to full plant-level systems, we focus on solutions that are maintainable, documented, and built for long-term operation.

Example Project

Control System Upgrade – Biogas Plant

Energy Sector

The Situation

A biogas plant operating on a legacy S7-300 control system faced increasing maintenance risk and limited expandability. Long shutdowns were not acceptable.

The Challenge

  • Continuous operation required
  • Limited commissioning window
  • Existing system needed to remain stable during preparation

Our Approach

  • ~2.5 months of detailed preparation and system design
  • Parallel development and testing of the new S7-1500 system
  • Step-by-step commissioning to minimize downtime

The Result

  • Successful migration to S7-1500
  • Commissioning completed in ~3 weeks
  • Stable operation with improved maintainability and future expansion capability

No production logos shown. Because this is industry, not Instagram.

Why Work With Us

Experience with Complex Systems

Plant-level automation systems for energy, biogas, and industrial environments that demand reliability.

Careful Preparation

Detailed planning before commissioning, not improvisation on site. Minimizing risk and downtime.

Clear Documentation

Structured systems with proper documentation for long-term maintainability.

Combined Expertise

Integration of automation and industrial IoT knowledge for comprehensive solutions.

Ethical Approach

Focus on reliable, ethical, and environmentally responsible projects.

Quality Over Volume

We do not chase cheap shortcuts or undefined support contracts. We build systems meant to last.

Let's Talk

If you are planning an automation upgrade, system expansion, or a new industrial automation or IoT project, you can reach us easily.

WhatsApp

Quick discussion

Message Us
📧

Email

Direct contact

Send Email
📞

Phone

Call us directly

+216 26 162 866

Or send us a message